Where a rooftop unit meets the roof, the assembly changes, and most commercial roof records in Elmsford, NY start there. A curb is a box of metal and flashing set into a membrane, and every unit, fan, vent and pipe on the roof adds one more joint to inspect. We walk each penetration, photograph its flashing from two sides and record the sealant, fasteners, counterflashing and the membrane around it. Elmsford is about 8.0 miles from Yonkers in a straight line, and the Saw Mill River Road exit on the Cross Westchester Expressway gives crews a defined route toward it.
A curb transition fails in a few predictable ways. The base flashing separates from the curb side, the counterflashing lifts and lets water behind it, sealant shrinks and opens, or the membrane tears where it was stretched over the corner. Each leaves a different mark on the roof, and each calls for a different repair.
We record the condition of each curb in the same order: base flashing, termination bar, counterflashing, sealant, corners and the membrane within a few feet. Units that have been replaced over the years often show mismatched curbs, adapter plates and added sleepers. The record notes those changes, because each one is a place where water can enter and a place where the original flashing may no longer match the equipment.
Pipe penetrations and small boots get the same walk. A rubber boot that has cracked at the top, a clamp that has loosened or a pitch pan that has dried and shrunk away from its post will each pass water without any sign above. We press on each boot, check the clamp and look for a gap between the post and the sealant. Their repair is cheap, but their number adds up across a large roof, and the record counts them.
Along I-287, the Thruway lists the Elmsford and Saw Mill River Road exit next to those for Hartsdale, White Plains and Tarrytown. That gives a crew a direct route from Yonkers, and it gives the owner a quick way to schedule a morning visit or a same-week return.
The final approach still decides the day. We ask the owner about lot size, truck turning room, overhead lines and any gate hours. If a crane or lift is needed to move a unit, we draw its setup point on a sketch and list the lanes and parking spaces it closes. Tenants then know in advance when a section of the lot will be blocked.
Travel is only part of scheduling. A crew arriving for a curb repair needs the roof access in working order, a safe way up and a contact who can answer questions on site. We confirm those three items by phone ahead of the visit and again on arrival, and the daily log notes the arrival time, the weather and the first condition observed.
Roof equipment work and roof work meet on the same day more often than owners plan for. A mechanical contractor lifts a unit, the roofer flashes the curb and the electrician reconnects power. If the sequence is wrong, the unit sits on an open curb overnight, or a new flashing is cut by the next trade.
We write the sequence into the work order: who shuts down, who lifts, who flashes and who tests. The roof assembly stays protected throughout. Where equipment is heavy, we check the deck and the supports below, not only the membrane. A curb and support review often reveals sleepers sitting on bare membrane, pipe supports without pads and conduit lying in water paths.
Condensate and refrigerant lines add their own risks. A condensate line that drains onto the membrane stains and softens it, and lines resting directly on the surface wear a groove where they rub. We note each line's route, support and discharge point, and we recommend pads or raised supports where the membrane is carrying the load. These items rarely appear on an equipment contractor's list, so the roof record is where they get written down.
The Westchester County Airport station counts about 104.7 freezing-or-colder days in a normal year. Metal curbs and pipes expand and contract with temperature, and sealant that was flexible in July cracks in January. Water gets into the cracks and freezes, which widens them.
We recheck penetrations after the first hard freezes and after each major thaw. The check is short: a photo of each curb, a probe of the sealant and a look at the counterflashing edge. When a joint has moved, the record shows where, by how much and whether the flashing or the sealant caused it. A penetration flashing repair that addresses the movement lasts longer than one that only adds sealant.
Penetration work is easy to price when each item is listed. A reseal costs less than a reflash, a reflash costs less than a curb rebuild, and a rebuild costs less than a membrane replacement around the unit. The report lists each penetration with a photo, a condition and a cost class, so the owner can fund the worst ones now.
Cost moves with access, the number of units, whether power must be shut off, the flashing material and any crane time. We state which items are in the scope and which depend on what the old flashing reveals. A leak repair that changes the roof assembly falls under the state's 2025 Uniform Code and needs a local permit check before work begins.
The curb file holds a numbered plan of every penetration, two photos of each and a condition table. It also records the equipment tag, if the owner provides one, so a future replacement can be matched to its curb. After repairs the file carries the after photos, the product data for flashing and sealant, and the date of each change.
Owners who keep this file find that equipment changes stop surprising them. A new unit can be checked against the existing curb size before it is ordered, and a mechanical contractor can see the flashing condition before lifting anything. The file also supports a warranty claim, since it shows what the membrane looked like at each date and who touched it.
The curb report ends with a ranked list: leaking or open joints first, loose sealant next, cosmetic items last. The owner decides how many to address this season. Nearby Hartsdale, Tarrytown and the Yonkers Nepperhan and Saw Mill valley use the same format, and each report is kept as part of a roof asset file for future budgets.
Base flashing, termination bar, counterflashing, sealant, corners and the membrane near the curb, each photographed.
Yes, if the curb flashing is cut or left open during the lift. We write the order of trades into the work order.
It hides movement without stopping it. A reflash that addresses the cause lasts longer.
Number of units, access, crane time, power shutdowns and the flashing material.
Roughly 8.0 miles by straight line. Road distance and the access window are confirmed ahead of the visit.